Successful medical device design follows a proven process that complies with the applicable regulatory standards. ISO 13485 requires that a comprehensive management system be established and maintained to monitor and control/mitigate risks from product inception through design transfer and into production, referred to by the FDA as Total Product Life Cycle (TPLC). There are various stage gate reviews during the TPLC with the Manufacturing Readiness Review being the final gate for the design transfer to production.

By the time a medical device design is ready to transfer to a medical manufacturing/production environment, many if not all of the identified risks should have been eliminated or mitigated (i.e. by design, process control, labeling). The design history file is complete with supportive verification testing data and the documentation to procure, fabricate, tool, build, and test has been released in support of a production lot build. But ... are you ready ?medical device manufacturing testing

manufacturing readiness review is a key tool of a proven process that provides the insight to determine whether the output of the design process coupled with the manufacturing, supply chain, and quality team preparedness meet all the requirements to move to a production manufacturing environment.

Moving through this gate without completing all the elements could cause costly engineering changes, rework and product recalls in the future. Moving too slowly through this gate could cause product launch delays and potentional erosion of market share. This is why a well planned and executed medical product development process with meaningful medical product design stage gates/reviews which culminate in a manufacturing readiness review will lead to a smooth transfer from medical device design to production.

Ron Jellison, KMC Systems President, lead a roundtable discussion at the MPO Symposium. The panel addressed questions about how to select a medical contract manufacturer. Ron Jellison spoke about the Manufacturing Readiness Review process in the "Building the bridge between OEM design and outsourced manufacturing." Click here to read more about the MPO Symposium discussion.

Topics: medical device design, Medical Product Manufacturing, Medical Product Design, medical device manufacturing, medical contract manufacturing